Theatre and Stage Machinery
At Acoustic Design, we realise that underlying every amazing performance is a symphony of precisely engineered components. Our modern theatre and stage equipment provide perfect scene transitions and dramatic effects by elegantly combining innovative technologies with strong design. From automated set motions to complex rigging systems, our solutions are customised to fit the particular needs of your production, therefore improving both safety and inventiveness.
A stage that changes with the scene
Stage machinery moves scenery and stage floors so a stage can change between scenes. We plan lifts, wagons and flown scenery with the stage, its sightlines and its safety systems, then coordinate delivery.

Planned with the stage and its acoustics
Stage machinery changes the scene, but it must not be heard doing it. We plan lifts, wagons and flown scenery with the stage, its sightlines and its structure, and we place the drives and controls with the room's acoustic design, so a scene change runs the same way at every performance and the auditorium stays quiet.
Machinery is planned from the productions the venue will host and from the building: the depth and height of the stage, the pit, the grid and the structure that carries the loads. We set the moving elements and their travel with your architect and structural engineer, then look at noise: where the drives sit, how they are isolated from the structure, and what the audience would hear in a quiet scene. The result is checked against the background noise target of the auditorium. Sightlines are verified for every position of the moving elements, so what the audience sees is what the designer intended, not the edge of a lift.

Equipment chosen for the productions
We work with the leading manufacturers of stage machinery and automation, but no single brand writes the brief. The scene changes your productions need, the loads and speeds, the safety functions and the service available in your country decide the shortlist, and we show you the comparison with the reasons for each choice.
The specification starts with what must move, how far, how fast and how quietly, and with who will operate it. From that we compare candidate lifts, wagons, revolves, flying systems and control platforms against load, speed, noise, safety category and the maker's support, spare parts and training in your region. Automation is specified for the productions the venue will actually host, not for the largest system the budget allows, so the stage crew can run it. You see the alternatives side by side and choose on facts, and the control system is specified so later additions join it without replacing what was installed.

One team from design to commissioning
We plan the machinery, coordinate its supply and installation with your contractor and the specialist manufacturer, and witness the tests and commissioning on the finished stage. The same team that planned the structure, the noise and the sightlines checks them on site, so the machinery is handed over as designed and documented.
Stage machinery is built into the structure, so it is coordinated with the building from the first drawings: pits, trap rooms, grid steel, power and the routes for cables and hydraulics. We put these on the combined drawings with the rigging, the lighting and the sound, check the builder's work at each stage, and coordinate the manufacturer's installation team on site. At commissioning every movement is tested with its loads, the safety functions and emergency stops are proved, and the noise in the auditorium is measured against the target. The test records and certificates go into the handover file. Scope and responsibilities are written into the proposal.

Proven, documented and trained
Our theatres and cultural centres were handed over with the machinery tested, its certificates filed and the stage crew trained on their own stage. You receive the as-built drawings, the load and travel schedules, the test records and the manuals, so each scene change can be run safely and we can support the stage afterwards.
Machinery is operated for decades by crews who change, so the handover is written for them: operating manuals, the safety procedures for each movement, the inspection and maintenance intervals, and the records of the commissioning tests. Operator training is part of the proposal, and we recommend a refresher when the crew changes. The handover file also lists the spare capacity in the control system and the structure for future additions. Ask us for the theatres where this was done; the stages we have delivered are the reference we point to, not a list of model numbers, and we remain reachable for inspections and changes as the productions evolve.
The machinery behind every scene change



Upper stage machinery
Fly bars for scenery and lighting and point hoists move flown elements above the stage, planned with the grid steel, the loads and the sightlines.
Lower stage machinery
Stage and orchestra-pit lifts, wagons and revolves change the floor between scenes, built into pits and trap rooms coordinated with the structure from the first drawings.
Stage control systems
Programmable motion control runs each movement on cue with a safety chain behind it, so the operator stays in charge of every lift, wagon and flown piece.
Fire and acoustic curtains
A proscenium safety curtain separates stage and auditorium in a fire, and acoustic curtains change how the room sounds; we plan both with the proscenium and the room's acoustic design.
Complete the stage
See the rest of our stage and Pro AVL range.
Brands we specify and integrate
These are brands we specify and integrate, not a closed list. We choose by performance, reliability and fit with the room's acoustic design, then integrate everything into one system.
From first survey to final finish
Seven steps, one team, one point of contact. Book a consultation and we'll come back to you with the next step.
Five steps, one team, one point of contact. Book a consultation and we'll come back to you with the next step.
Every space starts with the brief: who sits where, how people move, and what they need to see and hear. We plan the layout around it and design the room with its acoustics and technology together, with panel positions, fixings and finishes drawn up. Nothing moves forward until you have approved the design package.
Learn moreEvery space starts with the brief: who sits where, how people move, and what they need to see and hear. We plan the layout around it, so the acoustics fit the plan from the first sketch.
Learn moreThe room is designed with its acoustics and technology together, not one after the other. Treatment is drawn up with panel positions, fixings and finishes, and nothing moves forward until you have approved the design package.
Learn moreAn acoustician reads the room on site, or from your drawings and photos when a visit isn't practical. We set the acoustic targets, read reverberation, ambient noise and noise transfer against how the space is used, and review the design against them.
Learn moreEvery quotation comes with the specification behind it: products by type, quantity and finish, with costs set out line by line. What is quoted is what the design calls for.
Panels, baffles, ceilings, screens and seating come from the manufacturers we work with, supplied to the approved specification. What arrives on site matches what was designed.
Learn morePanels, baffles, ceilings, screens and seating come from the manufacturers we work with, supplied to the approved specification. Our own team installs them to the approved drawings, checking positions and fixings as they go. What arrives on site matches what was designed, and the handover is agreed with you.
Learn moreOur own team builds to the approved drawings, checking positions and fixings as they go. The team that supplies the treatment also installs it, and the handover is agreed with you.
Learn moreAfter fit-out, the room can be measured again and compared with its targets, so the result is measured rather than assumed. Compliance testing is carried out with accredited testing partners, and the written record goes into your building file.
Learn moreRecent case studies
Measured before. Measured after. That is how we report every project.
Questions about Theatre and Stage Machinery
Our answers on planning theatre and stage machinery: what it includes, upgrading an existing theatre, quiet running for the auditorium, commissioning and operator training.
The moving parts that change a stage, such as lifts, wagons and flown scenery, with their drives and controls. They are planned with the stage, its sightlines and its safety systems in view.
Yes, often in phases. We survey the structure, drives, controls and safety systems first, then plan an upgrade around the venue's programme.
Machinery noise can travel into the auditorium, so drives and controls are chosen and placed for quiet running during a performance. We plan them with the room's acoustic design.
We plan the system and coordinate its supply, installation and commissioning, so it is tested on the finished stage before handover. Scope and responsibilities are set out in the proposal.
It should be. We agree operator training and documentation in the proposal, so your stage team can run the machinery safely from the first show.
Ready to hear the difference? Let's talk.
Start with a free consultation meeting. Bring your drawings or just an idea, and leave with a clear next step for your space.