
Bath Prior Park College MP Hall – Phase 2
In 2026 we returned to the multipurpose hall at Prior Park College in Bath for a second, separate phase. After the suspended grooved acoustic panels of 2025, we designed and installed the wall cladding: grooved acoustic panels on the lower walls and flat timber panels above, so the hall's treatment now works from the walls as well as from above.
Phase two: the walls
In 2025 the first phase hung suspended grooved acoustic panels below the ceiling of this heritage hall. The walls were the next step. In 2026 we came back for a second, separate project and clad them: grooved acoustic panels along the lower walls, where people sit and speak, and flat timber panels above.
As with the first phase, the work had to sit quietly in a historic building, in a palette that matches the timber already overhead. The photographs on this page were taken in October 2026, after the work was finished.
The first phase is shown on its own page: Bath Prior Park College MP Hall.
Ready to hear the difference? Let's talk.
Start with a free consultation meeting. Bring your drawings or just an idea, and leave with a clear next step for your space.







